FPA Shop

Books

Fire Prevention on Construction Sites 9th edition

CODE FSB9-9NEW

£10.00

Member Price

£10.00

QTY

Add

The Joint Code of Practice 9th edition is widely recognised and highly regarded, and applies to activities carried out prior to and during the procurement, construction and design process. 

Often used as a condition of construction insurance, the scope of this code applies to projects with an original contract value of £2.5m or above, and applies equally to smaller value contracts where these are part of a large project. In cases where the construction contract or the insurance contract does not require this code to apply, it serves as best practice guidance.

The objective of the code is the prevention of fires on construction sites. The majority of fires can be prevented by designing out risks, taking simple precautions, and by adopting safe working practices. The code applies to all activities carried out prior to and during the procurement, construction and design process – not the complete structure – and should be read in conjunction with all current legislation and the HSE publication HSG168: Fire safety in construction.

The Fire Prevention on Construction Sites: The Joint Code of Practice on the Protection from Fire of Construction Sites and Buildings Undergoing Renovation can be downloaded electronically free of charge here.

QTY

Add Basket

The Joint Code of Practice 9th edition is widely recognised and highly regarded, and applies to activities carried out prior to and during the procurement, construction and design process. 

Often used as a condition of construction insurance, the scope of this code applies to projects with an original contract value of £2.5m or above, and applies equally to smaller value contracts where these are part of a large project. In cases where the construction contract or the insurance contract does not require this code to apply, it serves as best practice guidance.

The objective of the code is the prevention of fires on construction sites. The majority of fires can be prevented by designing out risks, taking simple precautions, and by adopting safe working practices. The code applies to all activities carried out prior to and during the procurement, construction and design process – not the complete structure – and should be read in conjunction with all current legislation and the HSE publication HSG168: Fire safety in construction.

The Fire Prevention on Construction Sites: The Joint Code of Practice on the Protection from Fire of Construction Sites and Buildings Undergoing Renovation can be downloaded electronically free of charge here.

Related Products

£40.00

Member Price

£32.00

QTY

Add

Get In Touch

To find out more about how we can assist you further please get in touch with us directly

News

Initially due to close on 17 August, the deadline for submission of feedback as part of the...NEWS

News

Hertfordshire Fire and Rescue Service (HRFS) was called upon to respond to a large blaze at...NEWS

The Fire Protection Association @TheFPA_UK

EEIS consultation deadline draws near. Find out more: https://t.co/XO4d1F8ZS6 #FireSafety #FireProtection #FPA

#FireSafety

#FireProtection #FPA