F&RM: Why was it felt that the LPS 1048 scheme needed updating?
David Ferguson: The main catalyst was the 2021 issuing of the draft EN 12845 (specifying requirements and gives recommendations for the design, installation, and maintenance of fixed fire sprinkler systems), and the
potentially significant changes in working practices for the UK market, contained in this most recent draft of the standard. The LPS 1048 scheme would, in its current format, be ill-suited to the requirements of the proposed EN changes and thus the needs of our membership.
This catalyst has also enabled us to review the scope and structure of the scheme which has successfully been in place for many years.