Overview of updates
Technical Bulletin 203: January 2024: 1
Annex K of BS EN 12845 confirms the number of sprinkler heads required to be tested based on the total number of sprinklers installed in a system. TB203 has always maintained 20 sprinkler heads as a minimum. However, to collect accurate data, batches of different sprinklers from different environments and quantities have been requested. Annex K of BS EN 12845 provides guidance on test numbers and what sprinklers should be evaluated for. What it does not confirm is the standard to which sprinklers are to be tested against.
There is no re-test standard and by default, BS EN 12259-1: 1999 Fixed firefighting systems — Components for sprinkler and water spray systems — Part 1: Sprinklers is adopted, the standard for new sprinklers. The requirements of the TB have always been to keep the numbers at a minimum for clients and contractors. However, data collected over the years has been insufficient to ascertain when exactly sprinkler heads need to be changed.
Previously, in an effort to meet with BS EN 12259-1:1999, function testing and temperature testing was split 80/20 through a minimum of a batch of five sprinklers from each environment. This resulted in four sprinklers being function tested, and one sprinkler being temperature tested. However, failures of temperature testing have resulted in the need to increase this element of the test.
Ensuring operability of sprinkler systems in the future and maintaining them in good working order is required by Part 2, Article 17 of The Regulatory Reform (Fire Safety) Order 2005 (RRO) which covers the maintenance of fire safety systems and outlines the legal obligation on the building owner/occupier’s responsible person to ensure their sprinkler system is suitably serviced and maintained. A well maintained sprinkler system includes essential inspection, service and maintenance routines including a programme for sprinkler head testing.
Technical Bulletin 203: December 2024: 1
In the December 2024:1 version of TB203, the split of sprinklers changed to 70/30, requiring seven sprinklers to be function tested, and three sprinklers to be temperature tested from a batch of 10 sprinklers from different environments, for the purposes of compliance testing and to ensure better data is captured.
To provide more accurate data, reproducing the table from Annex K was deemed no longer appropriate. The changes to section TB203.3.9 are based on scientific principles to allow better capture of data for analysis, providing more accuracy in decision making on sprinkler head replacements.
Requirements of TB203: January 2024 compared with TB203: December 2024
A summary of the changes is captured below:
|
Previous requirement (TB203: January 2024: 1)
|
New requirement (TB203: December 2024: 1)
|
|
Up to 5000 heads installed = 20 heads tested
|
Low/medium risk premises = 10 heads tested
|
|
Up to 10,000 heads installed = 40 heads tested
|
High risk premises = 50 heads tested
|
|
Up to 20,000 heads installed = 60 heads tested
|
|
|
Where there are different types of sprinkler heads installed a minimum of 5 sprinkler heads of each different type shall be removed and tested
|
A minimum of 10 sprinkler heads of each different type, per environment, shall be removed and tested
|
Examples of testing numbers based on the new requirements of TB203
School – Ordinary Hazard I-III
False ceiling: 10
Ceiling void: 10
Glazed atrium: 10
Sports hall: 10
Total: 40
Retail Unit – Ordinary Hazard III
False ceiling: 10
Ceiling void: 10
Total: 20 Total
Storage warehouse – High Hazard Storage
Roof system: 50
In-rack system: 50
Total: 100
Sprinkler System Service and Maintenance Guidance Records and Checklists
As a result of the changes, the Sprinkler System Service and Maintenance Guidance Records and Checklists and supplementary Template Forms (Appendices) outlining practical guidance for sprinkler system owners and specialist sprinkler maintenance contractors have also been updated and are freely available to download.